| Began operation |
August 2003 |
| Hours of operation |
Monday-Friday : 08.00-17.00 Hours./
8 hours. per day
Saturday: 08.00-12.00 Hours./ 4 hours. |
| Services offered |
Tank inspection, cleaning, repairs
and testing. |
| Facility |
A total of 4,200 m2, a storage area
of 3,600 m2. Cleaning bay area totalling 600 m2, all covered. |
| Security |
Fully fenced in, with external lights
and guards. |
| Insurance liability coverage |
US$75,000 public liability, US$275,000
for loss/damage to depot plant and equipment, and to client’s
equipment. |
| Lifting, handling & repair
equipment |
1x18 ton lift truck, welding/cutting
machine. |
| Testing equipment
|
A pressure/vacuum relief valve testing
rig, plus an air compressor with air dryer/filter for
leak test. |
| Spare parts |
All spare parts available. |
| Painting/blasting |
The depot does not have a paint booth.
Application is by brush. Customer stocks of spare paint
are not maintained. |
| Cleaning facilities/equipment
|
6 cleaning bay with high pressure
spinners. |
| Environmental systems |
The depot has a waste water neutralization
system. |
| Personnel |
6 employees, including 2 management,
1 inspector, 2 repairers, 2 cleaners. |
| Operating systems |
Inbound/off hire inspections performed
to customer’s criteria.
Customers advised daily of inventory and tank status.
Estimates, etc. kept 1 year. |
| Computer system |
The depot uses an in-house, purpose-designed
depot system.
The company does not communicate with its customers using
EDI, but is prepared to do so. The ISO CEDEX code is not
used. |
| Quality control |
The depot uses an in-house. |
| Safety instructions/equipment |
Procedures and equipment are in place
for safety and first aid. Safety equipment includes emergency
shower, eye wash, first aid box,
goggles, overalls, boots, gloves and breathing apparatus.
Safety warnings posted in work areas. |